Top Technology Bottle Shrink Wrap Packing Automatic Shrink Sleeve Wrapping Packaging Machine
Overview Top Technology Bottle Shrink Wrap Packing Automatic Shrink Sleeve Wrapping Packaging MachineProduct Description
Description
Basic Info
Model NO. | WD |
Manner of Packing | Both Ends Open |
Adjust Speed | Electronic Speed Control |
Type | PE Shrink Film Machine |
Heating Mode | Quartz Heating Tube |
Packaging Material | Film |
Product Name | Wrapping Machine |
Electrics | Siemens,Mitsubishi,etc |
Main Function | Bottle Packing |
Packing Speed | 8-10 Pack/Min |
Bottle Type | Pet Bottle, Glass Bottle, PE Bottle |
Certificate | CE,ISO,SGS |
Keyword | Film Wrap Equipment |
Shrink Film | PE POF PVC PP |
Function | Sealing Cuttting Shrink |
Model | Wd-150 |
Transport Package | Wooden Case |
Specification | 5050*3300*2100mm |
Trademark | Proman |
Origin | China |
Production Capacity | 200sets/Year Bottle |
Product Description
Top Technology Bottle Shrink Wrap Packing Automatic Shrink Sleeve Wrapping Packaging MachineProduct DescriptionDetailed PhotosProduct ParametersModel | WD-150 |
Overall Dimensions L*W*H(mm) | 5050*3300*2100 |
Weight of Machine(kg) | 1200 |
Heat Shrinkable Furnace Size(mm) | 3700*920*1750 |
Maxmum Size L*W*H(mm) | 600*400*350 |
Packing Speed(b/m) | 8-10 |
Width of Conveyer Belt(mm) | 920(can be adjusted to 200) |
Working Power | 380V 20kw |
Woring Pressure(Mpa) | 0.6-0.8 |
Machine Power(kw) | 20 |
Q3: What is your delivery time?A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.Q4: How to install my machines when it arrives? How much the cost?A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.Q5: How long time for installation?A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.Q6: How about the spare parts?A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.
Our Contact
Send now